Skip to content

Homeowners

Your home, from the first idea to the keys

New homes, full renovations and interior design. We help you decide what to do, design it with you, get the licences and stay on site until it's finished. All in English.

Tell us about your project
Homeowners

What we do

Services

New homes

Design and site management for detached houses and villas. We start from the plot, the planning rules and the way you live.

Full renovations

We rework layouts, open up spaces and renew the services. Flats, houses and ground-floor properties.

Interior design

Materials, lighting, made-to-measure furniture and the details. You see it in 3D before anything is touched.

Building licences

We handle the paperwork with the town hall so the work can start as soon as possible. In Spain almost any renovation needs one.

Step by step

How a home or renovation project works

Stage 01 / 06

We listen and run the numbers

We look at the property or plot, what the planning rules allow and what you want to do.

What you get
A clear proposal: what to do, how, and what our fees are.
Typical timescale
The proposal, on the day of the visit or the next.
Stage 02 / 06

We measure what's there

We survey the existing building: dimensions, structure, services and everything that will shape the project.

What you get
Drawings of the existing building, the basis for everything that follows.
Typical timescale
The first thing we do once you instruct us.
Stage 03 / 06

We design it and you see it in 3D

We design it with you, and you can walk through it in 3D and virtual reality. Changes are free now; on site, they aren't.

What you get
The full project: drawings, written specification, quantities and an itemised budget.
Typical timescale
A standard renovation, around two weeks. A new home, longer.
Stage 04 / 06

We get the licence

We submit everything to the town hall and answer any queries they raise.

What you get
The building licence or the registered declaration, ready to start work.
Typical timescale
2–3 weeks in Torre-Pacheco, Molina or Los Alcázares; 4–8 in Murcia or Cartagena.
Stage 05 / 06

We manage the build

We visit the site, sort out queries with the trades and check that what gets built is what was designed.

What you get
Oversight of the works and sign-off of each stage before you pay.
Typical timescale
As long as the build lasts.
Stage 06 / 06

We hand over and close the paperwork

We sign the completion certificate and sort out the occupancy licence and the Catastro update.

What you get
All the paperwork you need to live in, sell or let the property.
Typical timescale
When the build is finished.

Frequently asked questions

What people usually ask

Do you also manage the build?

Yes. Designing and disappearing doesn't work. We're on site so that what gets built is what was designed.

Do I need a licence to renovate my property in Spain?

Almost always, yes. Depending on the work it's a building licence or a 'declaración responsable' (a registered declaration). We tell you which one applies and we deal with the town hall.

Can I see what it will look like before we start?

Yes. We work with 3D models and virtual reality, so you can walk through your home before it exists and change anything you're not happy with.

Can you handle things while I'm abroad?

Yes. Many of our clients live part of the year outside Spain. We keep you updated by email and WhatsApp, with photos from site, and only need you here for the key decisions.

Let's talk

Where shall we start?

Answer a few quick questions and we'll tell you the first step. Then choose: WhatsApp or email.

What would you like to do?
Do you already own the property or plot?
Where is it?